Facebook X YouTube Instagram TikTok NetGalley

Skoryi-class Destroyer (Paperback)

Maritime > Ship Modelling

Imprint: Kagero
Series: Top Drawings
Pages: 20
Illustrations: Drawing sheets colour profiles
ISBN: 9788366148512
Published: 10th October 2019

in_stock

£12.00 RRP £16.99

You save £4.99 (29%)


You'll be £12.00 closer to your next £10.00 credit when you purchase Skoryi-class Destroyer. What's this?
+£4.99 UK Delivery or free UK delivery if order is over £40
(click here for international delivery rates)

Order within the next 1 hour, 3 minutes to get your order processed the next working day!

Need a currency converter? Check XE.com for live rates



Destroyers of Project 30bis, also referred to as the Smelyi-class (NATO: Skoryi-class), is a series of 70 Soviet destroyer ships built after the Second World War in the years 1950-1953. It was the most extended postwar series of destroyers in the world.

 

The ships of Project 30bis were created as a continuation of large destroyers from World War II, which were part of Projects 30 and 30K. However, in comparison to the 30 and 30K project destroyers, the new ships were slightly larger, and their hull was welded entirely. Moreover, the appearance of the superstructures changed, the armament was slightly modified, and more sophisticated electronic equipment was installed. The propulsion system was also modernized, increasing the power of the boilers. The project was developed in 1946 and approved in January 1947. The construction of ships commenced in 1948.

 

Although the first completed and commissioned on February 5, 1950, destroyer was Bditielnyi (Watchful), the entire series was named after the eighth destroyer Smelyi (Courageous), which was commissioned on March 19, 1950. This ship was used in the Gdansk Bay in the region of Baltijsk, Russia, for both state tests, and project qualifications. On the other hand, in the West, this type of ship began to be referred to as Skoryi-class, after the first identified ship.

 

The battleships were built in four shipyards: Leningrad, Komsomolsk, Nikolayev, and Severodvinsk. The construction of 85 vessels commenced, of which 70 vessels were completed, and the remaining ones were resigned.

 

There are no reviews for this book. Register or Login now and you can be the first to post a review!

Other titles in the series...

Other titles in Kagero...